Choose a design and run VCF Installer bring-up or a day-two workflow on it. If the design fails a rule that a step depends on, the run stops at that step. Inject a fault to see how it interrupts the run, then fix it and resume from the failed step. Nothing here connects to a real system.
Scenario labs
Each lab sets you a problem and a time limit, and you can switch the timer off. Design labs happen on the canvas: you score for each goal check you get passing, and lose 10 points for every other check that fails. Order labs ask you to put a patch sequence in a safe order. Run labs ask you to finish a broken run without starting over.
- 10 minutes
From proof of concept to production
The minimal site is a Simple deployment, and techdocs recommends High Availability for production environments. Switch its VCF instance to High Availability, give its management domain the 4 hosts it requires, then run bring-up in the simulator and fix the DNS fault it hits.
Start the lab: From proof of concept to productionLab objectives
Goal- High Availability host minimum for a vSAN management domain
Then: Bring up the management domain, with the Missing PTR record fault.
- 15 minutes
Stretch the management domain for a bank
A bank wants its management domain to keep running if one datacentre is lost. Stretch it across two availability zones, with a witness in a third site and the latency between the sites declared. Then stretch it in the simulator and fix the fault its validation finds.
Start the lab: Stretch the management domain for a bankLab objectives
Goal- Minimum hosts for a stretched management domain
- Production minimum hosts, stretched across two AZs
- Stretched vSAN needs a witness in a third location
- Stretched clusters use the same host count in each AZ
- Inter-site latency for stretched vSAN
Then: Stretch the management domain, with the vmnic mapping differs in AZ2 fault.
- 10 minutes
Give Supervisor a network
The application team wants Kubernetes on the production workload domain. Turn on Supervisor there and give it a connection, through an NSX Edge cluster with a Tier-0 gateway or a VNA cluster, then activate it in the simulator.
Start the lab: Give Supervisor a networkLab objectives
Goal- Supervisor needs a network connection
Then: Activate Supervisor.
- 10 minutes
Patch to 9.1.1 in a safe order
A 9.1.0.x fleet is due its 9.1.1 maintenance release, and the patch order someone drafted runs backwards. Put it in an order that satisfies every 9.1.1 patch dependency, then run it.
Start the lab: Patch to 9.1.1 in a safe orderLab objectives
Goal- An order that keeps 9.1.1 patch ordering
In the simulator: Patch the fleet to 9.1.1.
- 10 minutes
Recover a workload domain that failed partway
Creating a VI workload domain stops before the domain is built. Read the log, fix what stopped it, and finish the run without starting over.
Start the lab: Recover a workload domain that failed partwayLab objectives
Goal- Finish the run without starting over
In the simulator: Create a VI workload domain, with the Network pool out of addresses fault.
