BP-06 · central site · 10 edge sites
Edge sites run from a central site
Full name: VCF Edge Pattern 1: Centrally Managed Edge Compute Clusters
Ten or more remote sites, each a small cluster of one VI workload domain, run from the vCenter and NSX of a central site. Its starter design has 10 VCF Edge sites, each its own cluster of two or three hosts: 25 hosts in all, in one VI workload domain.
Take it apart
The drawing as a list: its 15 parts
- fleet-01Fleet · VCF Operations · VCF Automation · Identity Broker
- instance-aVCF instance · Site A + 10 VCF Edge sites · High Availability Small
- mgmt-aManagement domain · NSX ×3
- mgmt-a-cl01vSphere cluster · 4 hosts · vSAN ESA
- wld-edgeVI workload domain · NSX ×3
- wld-edge-cl01vSphere cluster · Edge site 1 · 3 hosts · vSAN ESA
- wld-edge-cl02vSphere cluster · Edge site 2 · 2 hosts · NFS
- wld-edge-cl03vSphere cluster · Edge site 3 · 3 hosts · vSAN ESA
- wld-edge-cl04vSphere cluster · Edge site 4 · 2 hosts · NFS
- wld-edge-cl05vSphere cluster · Edge site 5 · 3 hosts · vSAN ESA
- wld-edge-cl06vSphere cluster · Edge site 6 · 2 hosts · NFS
- wld-edge-cl07vSphere cluster · Edge site 7 · 3 hosts · vSAN ESA
- wld-edge-cl08vSphere cluster · Edge site 8 · 2 hosts · NFS
- wld-edge-cl09vSphere cluster · Edge site 9 · 3 hosts · vSAN ESA
- wld-edge-cl10vSphere cluster · Edge site 10 · 2 hosts · NFS
- mgmt-aManagement domain · NSX ×3
- instance-aVCF instance · Site A + 10 VCF Edge sites · High Availability Small
Sites, zones and regions
Key facts
- Licensing
- Through VCF Operations[18]
Enterprise use cases
- Remote offices and branchesA small cluster at each branch for local services, with vCenter, NSX and VCF Operations at the central site.
- FactoriesProduction systems on site, close to the line, while the platform is run from the central site.
- Retail storesA small cluster in each store, managed and updated from the central site.
- Tactical edgeMission systems on a few hosts in the field, managed from a central site when the link allows.
Industry verticals
Examples of where it fits. Your own recovery, availability and data residency requirements decide.
- RetailA VCF Edge site in each store
- ManufacturingFactories run from a central site
- Public sectorField and agency sites, as techdocs' Government and Defense edge blueprint describes
- Energy and utilitiesSubstations and remote operations sites
Typical add-ons
- VCF Operations
- vSphere Kubernetes Service
Checks on the starter design
3 checks need input69 of 73 checks pass on the starter design as it is. 3 need input: the design is missing facts they check, and 1 is a note. These checks and their sources are listed below. Open the design on the canvas to change it.
The 3 checks that need input and 1 note, each with its source
- NEEDS INPUTinstance-a VCF Management Services · VCF Management Services IP addresses: not checked yet. Add the number of IP addresses set aside for VCF Management Services to the design to check it. Evidence: rule verifiedSources: Deploy VCF Management Services and License Server as Part of VCF Upgrade to 9.1 · First VCF Instance FQDNs and IP addresses
What the sources say
A minimum of 12 IP addresses are required for deployment (/28 CIDR block).
Also: "The IP addresses can be contiguous or non-contiguous."Deploy VCF Management Services and License Server as Part of VCF Upgrade to 9.1VCF services runtime nodes *** Minimum: 12 IP addresses are required for deployment.
First VCF Instance FQDNs and IP addresses
- NEEDS INPUTVCF Automation · VCF Automation IP addresses: not checked yet. Add the size of the VCF Automation IP pool to the design to check it. Evidence: rule verifiedSources: Deploying VCF Automation as a Day-N Operation, IP addresses · VCF Installer Deployment Wizard, VCF Automation IP addresses
What the sources say
Because a /29 CIDR block provides eight IP addresses and VCF Automation requires five IP addresses, three addresses are free.
Deploying VCF Automation as a Day-N Operation, IP addressesFor deployments version 9.1.0.400 and later, you specify 5 IP addresses as contiguous or non-contiguous IP range.
VCF Installer Deployment Wizard, VCF Automation IP addresses
- NEEDS INPUTVCF Automation · Host size for the VCF Automation appliance: not checked yet. Add the cores per host in the management domain to the design to check it. Evidence: rule from a single sourceSources: Adrian Heissler: VCF Automation 9.1 anatomy · VCF 9.1.1 Planning and Preparation Workbook: VCF Automation tables (Static Reference Tables sheet) · VCF Taxonomy, where the fleet components run
What the sources say
- Not a techdocs page. It is kept only for the rule that the VCF Automation appliance needs a host with at least 12 cores and 24 threads, which neither the 9.1 techdocs pages nor the workbook state. The appliance size comes from the workbook's VCF Automation tables.Adrian Heissler: VCF Automation 9.1 anatomy
VCF Automation CPU Value Small 24 Medium 24 Large 32
Hidden sheet, quoted as table cells run together. Also: "VCF Automation RAM Value Small 96 Medium 96 Large 128", "VCF Automation Disk Value Small 600 Medium 900 Large 1200".VCF 9.1.1 Planning and Preparation Workbook: VCF Automation tables (Static Reference Tables sheet)A VCF fleet contains one or more VCF Instances and might contain one or more standalone vCenter instances, managed by the VCF Operations instance for the fleet. The components of the VCF fleet are running in the management domain of the first VCF Instance.
VCF Taxonomy, where the fleet components run
- NOTEwld-edge · In 9.1 creating a VI workload domain creates a new vCenter Single Sign-On domain, isolated from the other workload domains in the VCF instance. Evidence: verifiedSource: Create a New Workload Domain
What the source says
SSO Domain Name Enter the vCenter Single Sign-On (SSO) domain name, for example, example.domain.local . This creates a workload domain that is isolated from the other workload domains in your VCF instance.
The wizard asks: "Enter the vCenter Single Sign-On (SSO) domain name, for example, example.domain.local".Create a New Workload Domain
Sources
- [1] VCF Edge Detailed Design
- [2] VCF Edge Models
- [3] VCF Edge: Single Node with Argo CD Design Blueprint
- [4] VCF Edge Models, host placement
- [5] VCF Edge Models, requirements
- [6] Operational Context, VCF Edge Design Blueprint for Government and Defense Use Case
- [7] VCF Edge Pattern 1: Centrally Managed Edge Compute Clusters in a Workload Domain
- [8] VCF Edge Pattern 1: Centrally Managed Edge Compute Clusters in a Workload Domain
- [9] VCF Edge Detailed Design, deployment options
- [10] Edge Compute Node Design, VCF Edge Design Blueprint for Government and Defense Use Case
- [11] Edge Compute Node Design, VCF Edge Design Blueprint for Government and Defense Use Case
- [12] VCF Edge Models, requirements
- [13] VCF Edge Models, requirements
- [14] VCF Edge Pattern 1: Centrally Managed Edge Compute Clusters in a Workload Domain
- [15] VCF Edge: Single Node with Argo CD Design Blueprint, network
- [16] VCF Edge: Single Node with Argo CD Design Blueprint, network
- [17] VCF Edge Models, edge vCenter
- [18] VCF Edge Models, requirements
The use cases, industries and add-ons are judgement calls about typical fit, not Broadcom guidance.
- Drawing
- BP-06
- Title
- VCF Edge Pattern 1
- Release
- VCF 9.1.1
- Layout
- 1 instance · 2 domains
- Scale
- NTS
- Checked
- 3 checks need input